Reducing failure demand from 30% to 12% is an 18-percentage-point improvement. To interpret that change, the project needs a consistent denominator and evidence that the causes of repeat contact have changed. These percentages are the starting point and target for a calculation exercise. The sources reviewed did not establish a verified organisational case achieving this exact reduction.
Lean Six Sigma International'ın Sertifika Programları, the example shows how the choice of denominator affects a project target. It uses DMAIC to organise the investigation. No project results are assumed.
Define failure demand at the contact level
The National Audit Office’s 2024 examination of HMRC customer service includes contact arising from process failures within its description of failure demand. Delays and customers chasing progress also feature in the summary on nao.org.uk. A Lean Six Sigma team can use these categories to define how reviewers classify individual contacts.
The proposed proje sözleşmesi needs to specify the service boundary and the unit counted. Here, the unit is an incoming customer contact. Reviewers classify a contact as failure demand when the case record links it to an earlier service failure. Necessary follow-up gets a separate classification. Contacts with insufficient evidence remain unclassified until review.
The proposed measure is failure-demand contacts ÷ all in-scope incoming contacts × 100. Incoming contacts and internal rework activities need separate counts. Combining them would leave the 30% baseline without a clear unit of measurement.
Calculate the reduction, then test the denominator
The move from 30% to 12% gives two measures of reduction:
- Absolute reduction: 30%, 12% = 18 percentage points.
- Relative reduction in the proportion: (30%, 12%) ÷ 30% = 60%.
The 60% figure describes the reduction in failure demand’s share of incoming contacts. Calculating the change in contact volume requires the denominator. Let F represent failure-demand contacts and V represent all other in-scope contacts. The failure-demand proportion is F ÷ (F + V).
If V remains unchanged, the baseline implies F = (0.30 ÷ 0.70)V, while the target implies F = (0.12 ÷ 0.88)V. Under that assumption, failure-demand contact volume falls by 1, [(0.12 ÷ 0.88) ÷ (0.30 ÷ 0.70)] = approximately 68.2%. The calculation depends on other contact volume remaining constant.
The problem bildiriminde needs to distinguish these measures. A sponsor assessing the 60% reduction in failure-demand share also needs the contact counts to judge the reduction in workload. Changes in other demand affect that comparison.
Validate classification before building the Pareto chart
During the Measure phase, different reviewers independently classify the same contact sample. Their disagreements provide evidence for ölçüm sistemleri analizi. For example, classifying a progress enquiry requires enough case history to determine whether an earlier commitment was missed or the customer had been left without a clear next step.
Contact linked to case history
Classification reviewed
Failure categories ranked
Upstream cause investigated
Once reviewers apply the definitions consistently, the nedenlerin %[[NUM]]'sinden ranks the observed failure categories by frequency. This exercise assumes no category counts. The largest category is a candidate for investigation through the 5 Whys, with each proposed cause tested against case records.
Pilot changes at the source of repeat contact
Morris and Walley’s study published in Public Money & Management in 2022 identified repeated information exchanges in Gloucestershire Constabulary, as well as follow-up calls about action still awaited. The paper on tandfonline.com describes process changes that included revised call handling and remote resolution. For a Lean Six Sigma team, these findings direct attention to the earlier process decision that prompted another call.
Each change in the proposed pilot needs a cause supported by case evidence. A failed transfer warrants a test of clearer handoff ownership. A customer left without a clear next step gives the team a reason to test revised communication. The pilot must measure each intervention’s contribution towards the 18-point target.
In its 2024 report summary on nao.org.uk, the NAO found that HMRC could not track customers across all service channels or establish whether digital services had fully resolved their queries. That finding supports tracking unresolved cases as a dengeleme ölçütü in a Lean Six Sigma pilot. Contact volumes across the agreed channels remain necessary: fewer calls alone do not establish that more cases have been resolved.
Use control evidence before accepting 12%
NIST’s undated guidance on proportions kontrol grafikleri, published on itl.nist.gov, describes the p-chart’s binomial basis and independence assumption. Multiple contacts about the same unresolved case raise a dependence issue for a failure-demand kontrol grafiği. The statistical review needs to address that issue before the team interprets chart signals.
Sample size also enters NIST’s control-limit formula on itl.nist.gov. A reported 12% provides insufficient evidence of stability without its contact count and time sequence. The proposed İsraf edilen çaba. needs to retain classification checks and name the person responsible for investigating deterioration.
Lean Six Sigma International'ın Sertifika Programları follow the LSSx.0 pathway and cover DMAIC. At Green Belt level, the curriculum includes ölçüm sistemleri analizi and statistical process control, methods used to validate contact classifications and assess whether a reduction is stable.
Kaynaklar
- National Audit Office (2024), HMRC customer service: https://www.nao.org.uk/reports/hmrc-customer-service/
- National Audit Office (2024), HMRC customer service, summary: https://www.nao.org.uk/wp-content/uploads/2024/05/hmrc-customer-service-summary.pdf
- NIST/SEMATECH (undated), Proportions Control Charts: https://www.itl.nist.gov/div898/handbook/pmc/section3/pmc332.htm
